Welcome, Guest
Username: Password: Remember me

TOPIC: TUC 2014 - Information

TUC 2014 - Information 9 years 8 months ago #14235

  • c.coulet
  • c.coulet's Avatar
  • OFFLINE
  • Moderator
  • Posts: 3632
  • Thank you received: 1010
Dear All,

We are pleased to confirm that the number of participants registered to the 21st Telemac & Mascaret User Conference in Grenoble is now coming up to more than 50 persons (the number of attendees appearing on the telemac website does not show the real attendance).

As stated in previous information, registration should be done with the following link : user conference registration
First, click on the RESPONSE button to indicate you will attend to the conference
Then follow the link “Finally you can register on the following page.” to reach the final registration web site

For your information, please, find hereunder the titles of a part of presentations (to be validated after the review), and feel free to register and join us to :
the 21st Telemac & Mascaret User Conference in Grenoble. (15-17 October 2014).
  1. 2D and 3D Modelling of sediment dynamics in a large reservoir, Chambon reservoir France
  2. 2D modeling of tidal wave propagation through a large vegetated marsh
  3. 2D Numerical Simulations of Dam Failure
  4. 3D Flow and Transport Simulation of the Nile Estuary Taking into Account the Sea Level Rise
  5. 3D Sediment transport modelling and associated water quality issues
  6. A continental shelf model in Telemac 2D
  7. A secondary flow correction for the depth-averaged flow and morphodynamic modules of the Telemac Mascaret System
  8. A study of the HLLC scheme of TELEMAC-2D
  9. Analysis of the depoldering of the Hedwige-Prosperpolder with a 2D TELEMAC model (Scheldt estuary, the Netherlands and Belgium)
  10. Application of MASCARET for modelling manganese dispersion during a dam-break flood
  11. Assessment of an offshore disposal site in the Loire estuary through field monitoring and 3D numerical modeling
  12. Automatic Calibration with Telemac-AD
  13. Automatic differentiation for the optimal calibration of a MASCARET model
  14. Definition of scenarios and modelling of water level for the flooding risk management in the Seine estuary
  15. Development of a three-dimensional coupled system between TELEMAC-3D and TOMAWAC
  16. Direct Simulations of Bed Forms in the River Elbe, Germany
  17. Flood modelling on Ile de Ré during Xynthia
  18. Heat exchange with atmosphere module in TELEMAC-3D
  19. Implementation of controlled reduced tide and flooding areas in the TELEMAC 3D model of the Scheldt Estuary.
  20. Implementation of geotechnical and vegetation modules in TELEMAC to simulate the dynamics of vegetated alluvial floodplains
  21. In-depth HPC-LES investigation for the flow around a circular cylinder using TELEMAC3D
  22. Modeling storm surges in the Belgian coastal area
  23. Modelling of seaweed ingress to a nuclear power station cooling water intake
  24. Modelling the far field impacts of a tidal energy development at Ramsey Sound
  25. Numerical and experimental study of Favre waves with TELEMAC-3D and MASCARET
  26. Numerical simulation of coastal climate at a harbour site in the Great Lakes
  27. Numerical simulation versus in-situ sedimentary flux on sandy beaches as a function of the breaker parameter
  28. Numerical Study of Braiding Channels Formation
  29. Ongoing research on advection schemes
  30. Simulate the wind-wave attenuation on sea-grass meadow in Berre lagoon with Tomawac and SPH 3D
  31. Surface and subsurface flows: a coupled approach using ESTEL and TELEMAC2D
  32. Telemac-LinuxLifeCluster
  33. Wave energy dissipation by vegetation in TOMAWAC
Christophe
The administrator has disabled public write access.

TUC 2014 - Information 9 years 7 months ago #14280

  • Svensmolders
  • Svensmolders's Avatar
  • OFFLINE
  • Senior Boarder
  • Posts: 104
  • Thank you received: 20
Christophe,

can you tell already, for the people who are presenting, how much time we have to present? So we can start preparing a nice presentation :-)


Sven
The administrator has disabled public write access.

TUC 2014 - Information 9 years 7 months ago #14281

  • c.coulet
  • c.coulet's Avatar
  • OFFLINE
  • Moderator
  • Posts: 3632
  • Thank you received: 1010
Presentation : 20 minutes
Questions : 5 minutes
If possible for organisation, we advise authors to limit their presentations to 15 minutes. This will allow longer coffee breaks for discussions between users.
Christophe
The administrator has disabled public write access.
The following user(s) said Thank You: Svensmolders

TUC 2014 - Information 9 years 7 months ago #14428

  • c.coulet
  • c.coulet's Avatar
  • OFFLINE
  • Moderator
  • Posts: 3632
  • Thank you received: 1010
Hi

Here you will find the provisory planning of the conference.

File Attachment:

File Name: Provisory_planning_07oct.pdf
File Size: 78 KB


Best regards
Christophe
The administrator has disabled public write access.

The open TELEMAC-MASCARET template for Joomla!2.5, the HTML 4 version.